Remodeling,
2012-2013
Original
Ground breaking: November 13, 1953
Original Construction: 1953-1955
Original Dedication: May 5, 1957 by Elder Delbert L. Stapley
Original Architect: Martin Ray Young Jr.
Building Project Coordinator: F.P Neilson
Clerk and recorder of donations and payments: Dean V.
Johnson
———————————————————————————————————————
Remodeled: 2011 to 2013
Facilities Management: Mike Gardner
Priesthood Advisor: President Rondal Jones
Dedication: August 24, 2013 by President W. Ray Johnson III
Architect: David Mason
Contractor: AW Contracting Corporation
Construction Manager: Alan Collier
Photos from AW Contracting
The Mesa, AZ Inter-Stake Center is gets a new wood floor.
The 60-year-old floor was so damaged under the bleachers
that it was going to
require major repairs to the perimeter of the floor. We then
discovered that the adhesives and
matting under the wood floor (the black stuff in the photo)
was full of asbestos. Fortunately,
we found an abatement contractor and wood floor
manufacturer/installer
team to give us an offer to replace the entire new floor for
not much more than the repairs
would have cost to the sides. But gone is the old parquet
wood floor!
And yes, those are A/C ducts in the pictures.
Cleaning the last of the tar adhesive for the old floor
Inter Stake Center–Leveled south area ready for new wood
floor!
New bleachers being installed at Inter-Stake Center!
Zach, Sydelle and Alan from AW Contracting |